Nepal

KATHMANDU: Kathmandu Metropolitan City (KMC) has started construction of a portable steel overhead bridge at Chabahil chowk for the convenience of pedestrians. The bridge is going to be constructed at a cost of Rs 8.27 million.

KMC signed an agreement for the same with the construction company, Kanchhaman Construction Service, on November 13, 2019. As per the agreement, construction of the bridge — 23 metres long and two metres wide — should be completed within July 11, 2020. KMC Mayor Bidya Sundar Shakya laid the foundation stone for the bridge on Thursday.

Mayor Shakya said that the metropolis would gradually construct other overhead bridges at locations with high flow of pedestrians for their safety and to make movement of city vehicles smooth. The metropolitan city is to construct overhead bridges at Jayabageshwari and Maitighar completing them within the current fiscal year.

Rs 50 million has been allocated for the construction of overhead bridges this year. The post Overhead bridge at Chabahil chowk appeared first on The Himalayan Times.





Unlimited Portal Access + Monthly Magazine - 12 issues-Publication from Jan 2021


Buy Our Merchandise (Peace Series)

 


Contribute US to Start Broadcasting



It's Voluntary! Take care of your Family, Friends and People around You First and later think about us. Its Fine if you dont wish to contribute and if you wish to contribute then think about the Homeless first and Feed them. We can survive with your wishes too :-). You can Buy our Merchandise too which are of the finest quality.

Debit/Credit/UPI

UPI/Debit/Credit

Paytm


STRIPE





13